Managing the workflow and ensuring safety and quality standards

Upon receipt of the confirmation of the possibility of connection by HEP, the client is obliged to pay HEP the sum specified in the received offer. Furthermore, the construction process of the solar power plant with the installation of a two-way meter is carried on.

Within this step, an installation date for the client's new solar power plant is arranged.

Upon replacement and installation of the meter, it is necessary to obtain a certificate on the commissioning of the solar power plant for permanent operation.